Free Global Shipping Starts at $50

Alien Hydroponics V System Deep Water Culture (DWC) Hydroponic Growing Kit - 4 Pot 1 Row Header for Indoor Herb Garden, Leafy Greens & Hydroponic Farming - Perfect for Home Growers & Hydroponics Enthusiasts
Alien Hydroponics V System Deep Water Culture (DWC) Hydroponic Growing Kit - 4 Pot 1 Row Header for Indoor Herb Garden, Leafy Greens & Hydroponic Farming - Perfect for Home Growers & Hydroponics Enthusiasts
Alien Hydroponics V System Deep Water Culture (DWC) Hydroponic Growing Kit - 4 Pot 1 Row Header for Indoor Herb Garden, Leafy Greens & Hydroponic Farming - Perfect for Home Growers & Hydroponics Enthusiasts
Alien Hydroponics V System Deep Water Culture (DWC) Hydroponic Growing Kit - 4 Pot 1 Row Header for Indoor Herb Garden, Leafy Greens & Hydroponic Farming - Perfect for Home Growers & Hydroponics Enthusiasts

Alien Hydroponics V System Deep Water Culture (DWC) Hydroponic Growing Kit - 4 Pot 1 Row Header for Indoor Herb Garden, Leafy Greens & Hydroponic Farming - Perfect for Home Growers & Hydroponics Enthusiasts

$985.16 $1791.21 -45% OFF

Free shipping on all orders over $50

7-15 days international

16 people viewing this product right now!

30-day free returns

Secure checkout

15978387

Guranteed safe checkout
amex
paypal
discover
mastercard
visa
apple pay

Description


Alien Hydroponics V-System DWC - 4 Pot 1 Row Header

Transform your indoor gardening experience for the better with the Alien Hydroponics V-System Deep Water Culture Kit.?

The V-System deep water culture hydroponic system is made to improve how you grow plants in confined spaces with cutting-edge features for optimal plant health and maximum yields.?

This hydroponic kit uses the Venturi Valve Technology to ensure proper oxygenation in the root zones of your plants. There is no need to deal with clogged airstones or complicated air pumps, as the V-System Kit creates a powerful whirlpool vortex to distribute the nutrients to your plants equally.??

The V-System hydroponic bucket system also features a modular design. You can customize the bucket layout as your garden evolves.?

As a safety feature, the V-System hydroponic kit has a temperature control to ensure cooler water temperatures and reduce the risk of root rot.


Alien Hydroponics V-System 4 Pot Features


Venturi Valve Technology
Venturi Valve Technology

The V-System deep water culture kit uses Venturi Valve Technology to ensure healthier root zones by optimizing oxygenation.


Temperature Control
Temperature Control

Reduce root rot chances with the built-in temperature control of the V-System hydroponic kit.


Modular Design
Modular Design

When you’re ready to expand your system, you can customize the bucket layout up to four rows with ten pots in each row for optimal distribution in each pot.


Equal Nutrient Distribution
Equal Nutrient Distribution

The V-System hydroponic bucket system ensures equal nutrient distribution so all plants grow healthy.




Alien Hydroponics V-System 4 Pot Highlights

  • 15 gallon (58L) V-POT
  • Water fill line
  • Total-drainage bases
  • Venturi injectors
  • Inspection Covers
  • 5" spiral tubing
  • 5" Dual-Flow? fittings
  • Integrated filtration
  • T304 Stainless clamps
  • Heavy-duty components
  • Push-fit feed connections
  • JET-STREAM? Vortex? pump

What is Included in the?Alien Hydroponics V-System 4 Pot?

  • 1x V-SYSTEM Vortex Water Pump 180W 120V 10800 l/h
  • 4x V-Pot 58L
  • 4x V-Pot Base
  • 4x V-Pot Lid
  • 4x V-Pot Lid Inspection Cover
  • 4x Square Net Pot
  • 4x?V-Pot Clip
  • 4x?Air Filter for V-SYSTEM Venturi, 6mm
  • 4x?Silencer for Venturi
  • 4x?Venturi Fitting
  • 4x Venturi Air Inlet Pipe 6mm Blue (2X 4")
  • 4x?Venturi Inlet Fitting for 22mm Pipe
  • 5x Nut 5"
  • 5x Washer 5" Green Silicone
  • 10x 5" Stainless Steel Clamp
  • 1x Distribution Tee 40mm
  • 1x DM Push-Fit Elbow 22-15mm V-SYSTEM
  • 1x DM Push-Fit Elbow 22mm V-SYSTEM
  • 3x DM Push-Fit Tee 22-15mm V-SYSTEM
  • 1x Drain Cap 1/2"
  • 1x Drain Tap 1/2"-16mm Barb
  • 1x Elbow 5" Barbed with Drain Point
  • 2x Elbow 5" Threaded Dual-Flow
  • 1x Filter Manifold, Complete 40mm
  • 1x?Float Valve
  • 1x V-SYSTEM Header Pot 20L 40mm
  • 1x?Silver Lid
  • 1x?Header Pot Blank
  • 1x?Hosetail 16mm-3/4" Female Green
  • 4x Pipe 22mm Rigid 1 Meter - Venturi Feed
  • 1x Pipe 32mm Red 1 Meter Spiral
  • 3x Pipe 40mm Silver 1 Meter Spiral
  • 5x Pipe 5" Spiral 80cm
  • 1x Tee 5" Barbed
  • 3x Tee Threaded 5" Dual-Flow
  • 2x Threaded Tank Connector 1"
  • 1x Vortex Pump Inlet Manifold40mm long
  • 2x 1" Cap for Chiller Connections
  • 1x T/Connector Straight 32mm
  • 1x T/Connector Straight 40mm
  • 1x Terminal Manifold Left
  • 1x Terminal Manifold Right
  • 10x 22mm Insert for 22mm Rigid Pipe
  • 2x Clamp Size 2
  • 4x Clamp Size 3
  • 1x 8mm Screwdriver for 5" Clamp
  • 1x Wrench 5"
  • 1x Wrench for Float Valve
  • 1x 8mm Socket for 5" Clamp
  • 1x Pipe Cutter 50mm
  • 1x?Silicone Grease - Food Grade

Alien Hydroponics V-System 4 Pot Specifications

Number of pots:4
Number of rows:1
Kit total fluid volume:63.4 gallons (240 L)
Minimum assembled size (can space pots more widely for a larger footprint):
Length:9' 3.0" (111.0 inches / 2820 mm)
Width:3' 1.0" (37.0 inches / 940 mm)
Water Pump Included with the Kit:
Model:V-SYSTEM Vortex Water Pump 180W 120V 10800 l/h
Wattage:180 watts
Flow Rate:2853 gal/hr (10800 L/hr)
Recommended water chiller minimum capacity:132 gallons (500 L)

Alien Hydroponics V-System 4 Pot Manual

Manual?

Manual?


Alien Hydroponics V-System 4 Pot Warranty

Alien Hydroponics provides a 3-year warranty for all parts and a standard 1-year warranty for pumps.